Construction of the Rapid Transit System Link (RTS Link) connecting Johor and Singapore is progressing smoothly, with the project reaching about 65% overall completion, according to its operator.<br /><br />The information was shared with the media during Transport Minister Anthony Loke’s visit to the Bukit Chagar station construction site on Monday (Nov 3).<br /><br />Read more at https://tinyurl.com/2b5pcvzb<br /><br />WATCH MORE: https://thestartv.com/c/news<br />SUBSCRIBE: https://cutt.ly/TheStar<br />LIKE: https://fb.com/TheStarOnline<br />
